For professionals
For Section 75 and complaints teams: independent inspection evidence on a spray foam claim
An inspection of the roof as it is, the installation set against its product approval, and the paperwork set against both. Fixed structure, fixed fee, no view on the claim.
- Jan Pospisil inspects every loft himself
- DEA qualified (ABBE Level 3)
- PAS 2035 training completed
- inspections carried out in line with PCA guidance
- Professional indemnity insurance: Markel International, policy CE71551
- No installation. No removal. No referral fees.
- ICO registered data controller: ZC185512
- England & Wales, from a North West base
The problem the report is built for
A spray foam Section 75 claim usually arrives with a removal quote, a handful of photographs and an installer that has stopped trading. The published ombudsman decisions show what carries weight: evidence gathered while the foam is in place, by someone with no stake in removal, that ties what was found to the installation rather than to the removal. Of the 21 unsuccessful decisions to November 2026, ten had the foam removed before anyone independent inspected it, and five rested on a report from a removal firm, a cold-caller or a competitor. SprayFoamCheck provides first-hand evidence in a report built so your case handler finds the same thing in the same place on every case. Visit dates are offered with your final-response date in mind.
What you receive
The matters a card issuer's Section 75 team asks about, answered one by one with section references, after a one-page summary of the case facts and findings.
The paperwork review: what the pack says, what the roof shows, and where they disagree. Nothing in it states or implies intent.
Photographs and readings tied to every finding; the occupier's own photographs, where supplied, kept separate; observation and opinion kept apart, with the alternative named.
A PDF with numbered pages and bookmarks, a verify code, and written answers to your case handler's questions without charge.
The evidence standard
Built around what the Financial Ombudsman relied on, or found missing, in the 27 published spray foam decisions.
Inspected in place before any removal; after removal, the roof as it was left.
Photographed and measured, with the instrument stated and the display photographed.
The installation set against its product approval's conditions of use and BS 5250:2021.
The paperwork read against the roof and against what the homeowner was told.
Observation and opinion kept apart; independence declared inside the report; the fee fixed before the visit; a verify code on every report; written answers without charge.
How to instruct
Send the property postcode, the occupier's contact details, your claim reference and any deadline.
Jan confirms the fee and the visit date in writing before the inspection and contacts the occupier to arrange access. Send the documents you hold; the report lists what is in the pack and what is not.
The report arrives as a PDF within 48–72 hours of the visit, addressed to your team. Questions are answered in writing, and an answer given to you can be shared with the occupier.
Fee, turnaround, coverage
- £295 per inspection, agreed before the visit and independent of the findings
- Post-Removal & Insulation Check £375
- Express report +£50, delivered 24 hours from the inspection visit
- Standard report within 48–72 hours of the visit
- Travel included within about three hours' drive of the North West base; beyond that a supplement, shown as a worked total before you confirm
- England & Wales (Scotland, Northern Ireland and islands by arrangement)
- Invoiced to the instructing party or to the homeowner, as you prefer
- Bank transfer
What the report does not do
- It gives no view on breach of contract, on liability, on the claim or on its value. Those questions belong to the instructing party, the ombudsman or a court.
- It gives no costs and no quotation, and it names no contractor. Recommended actions are given in principle, by trade.
- It is not a valuation and not a report for a mortgage decision. No outcome with any lender is promised or implied.
- It is not legal advice, and it is not prepared for court proceedings: Section 75, complaint and ombudsman stage only.
- It records what could be seen, reached and measured on the day. It does not assess structure, electrics or plumbing, or the roof covering above the underlay, and it cannot see timber concealed by foam.
- Equity release and lender-mandated instructions are not taken.
- The report says whether what was found is consistent with the installation's conditions of use. Whether that amounts to a breach, and whether removal was reasonably necessary, is for you.
Questions Section 75 teams ask
Send an instruction or a question
One form for a single case, an ongoing case flow, or a question before you instruct. Jan replies himself, normally the same working day.
Google Reviews
What people say on Google
Tunde Adeolu Adewole
August 2026
Why are all our reviews on Google?
Simple: Google reviews are the one thing we can't control. We can't edit them, hide them, or choose which ones you see. Every review is posted from a Google account and is published unedited, in public, where anyone can read it.
We built SprayFoamCheck on independence — no removal arm, no referral fees — so our reviews sit on the one platform where we have no say over what's shown. If a review site let us filter or curate, it wouldn't prove anything.
Still on the fence? Don't take this page's word for it. Read what other homeowners wrote, straight from the source — then decide.