If spray foam was removed and foil (multifoil) fitted, check it against your paperwork and any product approval, one step at a time. Not every multifoil installation is a problem. The approvals opened ask for taped laps and battens over the foil; their worked examples all include other insulation.[1][2][3]
Your next step:Foam removed and foil fitted? Get both checked
On this page
Key facts
- We found no public warning naming multifoil fitted after spray foam removal, as of 10 November 2026.
- The approvals opened require taped laps of at least 50 mm and counter-battens over the foil.[1][2][3]
- Every worked example in the three BBA approvals opened includes other insulation.[1][2][3]
- Under an underlay with a high vapour resistance, two approvals opened say the space beneath it should be ventilated.[1][3]
- None of the under-rafter approvals opened covers a cold loft insulated at ceiling level.[1][2][3]
Multifoil installation and paperwork checklist
What the product approvals we opened ask for, and the paperwork that shows it was done. Tick what you have or can see. Print or save the list to take to the installer, building control or a surveyor.
0 of 22 items ticked
If something is missing
- Ask the installer in writing, and keep the reply.
- LABC's guidance treats a multifoil as acceptable when it is used strictly as its product approval sets out, so a mismatch matters even if the paperwork looks complete.
Based on: LABC (council-hosted) (April 2008) (opens in a new tab)
- Behind plasterboard, most of this list can't be seen. An inspection records what can be seen and tested, and says what is hidden.
Read more:How to check multifoil was installed properlyWhat paperwork you should haveMultifoil product approvalsMultifoil fitted after spray foam removalAfter removal: what good looks like
Step by step
Find the paperwork
Gather the quote, contract, invoice and any product approval, the third-party document that sets a product's installation conditions. Each approval opened covers named products; we have not checked their current status.[1][2][3] See what paperwork should you have?.
Check the product matches the contract
Compare the product named on each document with the one on the approval. Conditions differ by product: one approval opened gives staples typically at 300 mm centres, another at no more than 100 mm.[1][2] See multifoil fitted after spray foam removal.
Look at the eaves and ventilation
Two approvals opened say the foil is cut around the rafters at the eaves and taped.[1][2] Where the underlay (the layer under the tiles) has a high vapour resistance, as bitumen felt does, two say the space under it should be ventilated.[1][3][4] See what to check after spray foam removal.
Check the battens, cavity and taped joints
The approvals opened ask for laps of at least 50 mm, taped, and counter-battens over the foil.[1][2][3] They count the cavity (air gap) beside the foil from 13 mm deep in a roof.[1][2][3] Plasterboard is fixed to the battens.[1][2][3] In a finished room it hides these layers. See how to check multifoil was installed properly.
Ask what extra insulation was fitted
Every worked example in the three BBA approvals opened includes other insulation.[1][2][3] For an existing roof they add 45 mm to 125 mm of rigid board, depending on the product and batten direction.[1][2][3] See what insulation should replace spray foam after removal?.
Watch for condensation signs
We hold no sourced list of signs specific to multifoil. A Cornwall energy charity's page, which carries a Cornwall Council Trading Standards warning (undated), says foil added to a loft can trap moisture in the rafters.[5] If you see moisture, photograph it and note the date. See does foil insulation cause condensation?.
Get an independent record if anything does not match
An independent check records what can be seen and measured, and says what is hidden. SprayFoamCheck's Post-Removal & Insulation Check is that kind of record: independent evidence for your own decision. See what an independent check can add.
What to do next
- Note the exact product name on every document.
- Ask the firm in writing which product approval the foil was fitted to, and what extra insulation was included.
- Keep any photographs taken before the foil went up.
Foam removed and foil fitted? Get both checked
A Post-Removal & Insulation Check looks for remaining foam at every accessible point, records the condition of the timbers that can be reached, and checks the new insulation against its product approval.
Report within 48–72 hours of inspection. Independent: no installation, no removal, no referral commissions.
Travel included within about three hours of the North West; a fixed supplement further away, shown with your total before you book.
It's evidence for your own decisions. It records what can be seen and measured, and says what is hidden.
Questions first? Call or WhatsApp 07349 718935 WhatsApp (opens in a new tab)
Case files like this
Anonymised inspections Jan has carried out. Every loft is different.
See all case filesGo deeper: the original sources
2 original documents, each with a note on what it covers.
Questions people ask
Is the foil breathable?
Should foil go under the rafters of an unused loft?
None of the four approvals opened addresses an unused (cold) loft or insulation at loft-floor level.[1][2][3][6] A Cornwall energy charity's page, which carries a Cornwall Council Trading Standards warning (undated), says adding foil to a loft "isn't recommended" and gives little insulation benefit there.[5] It also says foil suits some situations.[5]
How do I know the foil was fitted properly?
By checking what can be seen against the product approval. A SprayFoamCheck case file is one example: Foam out, foil in: foam still filled the eaves, and the foil wasn't the one contracted. There, the foil hung from staples alone; the approvals opened describe counter-battens fixed over the foil.[1][2][3] It is one house, not a measure of how often this happens.