A multifoil product approval is a third-party document setting out what a product was assessed for, its figures and how it must be fitted; it does not show that your installation followed it.[1] UKAS suspended the BBA on 26 February 2026.[2] The latest end date UKAS gave, 25 November 2026, has passed, and UKAS had published no update when we checked on 26 November 2026. UKAS says existing approvals remain valid until they expire.[2]
On this page
Key facts
- UKAS suspended the BBA on 26 February 2026. UKAS had published no update when we checked on 26 November 2026, and the BBA's home page still said the suspension was in place.[2][3]
- UKAS said on 15 June 2026 that existing BBA approvals remain valid until they expire. The latest end date UKAS gave for the suspension, 25 November 2026, has passed.[2][4]
- Every worked example in the three BBA approvals we opened includes other insulation.[1][5][6]
- Core thermal resistance in the approvals opened, for the product alone with no air gaps, runs from 0.91 to 3.58 m²K/W.[1][5][6][7]
- The two LABC registered details opened had stated validity that ended on 11 November 2018 and 11 November 2019.[8]
- BS EN 16012 was withdrawn on 13 July 2023 and replaced by BS EN ISO 22097:2023. The BBA approvals opened still cite the old standard.[9][10][1][5][6]
What is a product approval, and what does it prove?
A product approval is a third-party document about a named product: it sets out the use the product was assessed for, with the figures and fitting…
Which multifoils have one?
The approvals we opened cover the eight products below.
What do the approvals say about performance?
They give three things: a thermal resistance for the product alone, an emissivity for its foil face, and a resistance for the air gap beside it.
What conditions do they set?
Each approval sets fitting conditions, and they differ by product.
Does an approval mean the installation meets building regulations?
No. An approval describes a product and how to use it; it is not a finding about any one roof.
Is my approval still current?
Only the issuing body's own register can say, and as of 10 November 2026 we have not checked it for any approval on this page.
How do I check an approval against my paperwork?
Match five things.
What to do next
- Find the product name and the approval number on your contract or invoice.
- Look the number up on the issuing body's own register, and note the date.
- Compare the approval's stated use with where your multifoil is.
- If yours is a BBA approval, check its status again from time to time: the latest end date UKAS gave for the suspension that began on 26 February 2026 was 25 November 2026, and UKAS had published no update when we checked on 26 November 2026.[2]
Get the foil checked independently
A Multifoil / Foil Inspection records what is fitted, how it is fixed and sealed, the air gaps and ventilation that can be seen, and moisture readings at the timbers that can be reached.
Report within 48–72 hours of inspection. Independent: no installation, no removal, no referral commissions.
Travel included within about three hours of the North West; a fixed supplement further away, shown with your total before you book.
It's evidence for your own decisions. It records what can be seen and measured, and says what is hidden.
Questions first? Call or WhatsApp 07349 718935 WhatsApp (opens in a new tab)
Go deeper: the original sources
3 original documents, each with a note on what it covers.
Questions people ask
Is a "BBA certificate" the same as a product approval?
Yes. It is the name paperwork and search results often give to the document this guide calls a product approval. For multifoil, the BBA approvals we opened are 17/5388, 18/5575 and 06/4379.[1][5][6] Check both the number and the product name against your paperwork, because each approval covers named products only.
Is my multifoil's BBA approval still valid?
UKAS suspended the BBA on 26 February 2026, and said on 15 June 2026 that existing BBA approvals remain valid until they expire.[2] The latest end date UKAS gave, 25 November 2026, has passed.[2][4] UKAS had published no update when we checked on 26 November 2026, and the BBA's home page still said the suspension was in place.[2][3] Check your own approval's number on the BBA's register; we have not yet done so.
Is LABC registered multifoil accepted everywhere?
A common claim is that an LABC registered multifoil is accepted across England and Wales. The two LABC registered details we opened had stated validity that ended on 11 November 2018 and 11 November 2019, and both call for a site-specific thermal analysis.[8] We have not checked whether newer registered details exist.
How is multifoil insulation tested?
BR 443 says U-values for multi-foil should rest on data from a recognised test body: core resistance plus surface emissivity, or a hot-box (laboratory) test with an airspace each side.[13] A page that says a product is tested to EN 16012 is out of date: BS EN 16012 was withdrawn on 13 July 2023 and replaced by BS EN ISO 22097:2023.[9][10]
Sources