You check a multifoil installation against the conditions in the product approval for that product. Two of the approvals opened describe multifoil stapled under the rafters, laps taped, counter-battens over it, plasterboard fixed to the battens, and extra insulation as well.[1][2] Once the plasterboard is on, much of this is hidden, and an honest check says so.
On this page
Key facts
- All three BBA approvals opened require laps of at least 50 mm, taped.[1][2][3]
- All three BBA approvals opened describe battens over the multifoil, with plasterboard fixed to them.[1][2][3]
- BBA 18/5575 counts an air gap only where it is at least 13 mm deep in a roof, or 20 mm in a wall.[2]
- Every worked example in the three BBA approvals opened includes other insulation as well as the multifoil.[1][2][3]
- Where the underlay has a high vapour resistance, two approvals say the space under it should be ventilated.[1][3]
What does a correct multifoil installation look like?
A correct under-rafter installation is a layered build-up, not a sheet of foil on its own.
What are the ten things the product approvals require?
The approvals opened set ten conditions, listed here in the order an inspection would check them.
| Condition | What to look for | Which approval |
|---|---|---|
| 1. Position | Stapled tight to the underside of the rafters, from ridge to eaves, typically at 300 mm centres (17/5388) or at no more than 100 mm (18/5575). | 17/5388, 18/5575[1][2] |
| 2. Laps | Overlapped by at least 50 mm and taped: 75 mm foil tape (17/5388), 100 mm foil tape (18/5575), acrylic tape at least 50 mm wide (06/4379). Tears and cuts taped before boarding. | All three BBA[1][2][3] |
| 3. Eaves | Cut around the rafters and taped to the wall plate (the timber on top of the wall), or the cavity wall insulation (17/5388). | 17/5388, 18/5575[1][2] |
| 4. Battens | Counter-battens over the multifoil: typically 38 × 47 mm at 600 mm centres (17/5388); no more than 600 mm apart (18/5575); at least 38 × 50 mm, for a 20 mm gap (06/4379). Extra battens around roof windows. | All three BBA[1][2][3] |
| 5. Air gaps | An unventilated cavity on each side of the multifoil. It counts only where it is at least 13 mm deep in a roof, or 20 mm in a wall. | 18/5575[2] |
| 6. Above the insulation | Where the underlay has a high vapour resistance, a ventilated space under it, as BS 5250:2011 or the underlay's own approval sets out. | 17/5388, 06/4379[1][3] |
| 7. Lining | Plasterboard fixed to the battens: to BS EN 520 (17/5388, 18/5575) or 12.5 mm (06/4379). | All three BBA[1][2][3] |
| 8. Extra insulation | Required (17/5388, Kiwa). Every worked example in the three BBA approvals includes other insulation. | All four[1][2][3][4] |
| 9. Heat | No contact with anything hotter than 80 °C. | All four[1][2][3][4] |
| 10. Over-rafter type | For the breathable type: 25 mm battens parallel to the rafters, 100 mm laps taped, and covered at once. | Kiwa BAR-18-045-P-A-UK[4] |
Where an approval is not listed against a row, we did not record that condition from it. That does not mean the product is exempt.
Multifoil installation and paperwork checklist
What the product approvals we opened ask for, and the paperwork that shows it was done. Tick what you have or can see. Print or save the list to take to the installer, building control or a surveyor.
0 of 22 items ticked
If something is missing
- Ask the installer in writing, and keep the reply.
- LABC's guidance treats a multifoil as acceptable when it is used strictly as its product approval sets out, so a mismatch matters even if the paperwork looks complete.
Based on: LABC (council-hosted) (April 2008) (opens in a new tab)
- Behind plasterboard, most of this list can't be seen. An inspection records what can be seen and tested, and says what is hidden.
Read more:What paperwork you should haveMultifoil product approvalsMultifoil fitted after spray foam removalAfter removal: what good looks like
Can plasterboard go straight onto multifoil?
Not in the approvals opened.
What extra insulation should be there?
Some: every worked example in the three BBA approvals opened includes other insulation as well as the multifoil.
What should be above the multifoil?
Above the multifoil are the rafters with the extra insulation, then the underlay (the felt or membrane under the tiles).
What can and cannot be checked once the plasterboard is on?
Once the plasterboard is on, most of the ten conditions are behind it and cannot be confirmed by looking at the finished room.
Which faults are most common?
We cannot say which are most common.
What can an independent inspection add?
An independent inspection gives you a written record of what can be seen and measured, set against the conditions in the product approval for your product.
What to do next
- Find the product name on your paperwork, and the product approval that goes with it.
- Go through the ten conditions and note which you can see and which you cannot.
- Ask the installer for the U-value calculation and for what extra insulation was fitted.
- If something does not match, an independent inspection can record what is there.
Get the foil checked independently
A Multifoil / Foil Inspection records what is fitted, how it is fixed and sealed, the air gaps and ventilation that can be seen, and moisture readings at the timbers that can be reached.
Report within 48–72 hours of inspection. Independent: no installation, no removal, no referral commissions.
Travel included within about three hours of the North West; a fixed supplement further away, shown with your total before you book.
It's evidence for your own decisions. It records what can be seen and measured, and says what is hidden.
Questions first? Call or WhatsApp 07349 718935 WhatsApp (opens in a new tab)
Case files like this
Anonymised inspections Jan has carried out. Every loft is different.
See all case filesGo deeper: the original sources
4 original documents, each with a note on what it covers.
Questions people ask
How far apart should multifoil staples be?
Do multifoil joints have to be taped?
Yes, in all three BBA approvals opened. Laps must overlap by at least 50 mm and be taped, and tears and cuts must be taped before the plasterboard goes on.[1][2][3] The approvals say each product acts as a vapour control layer, which holds back water vapour, only when its laps and joints are taped.[1][2][3]
Can multifoil touch downlights, cables or a flue?
All three BBA approvals opened say multifoil must not touch anything hotter than 80 °C.[1][2][3] BBA 18/5575 says covered cables may need de-rating (a lower permitted load), to as little as half their free-air capacity; downlighters should follow the maker's guidance.[2] Approved Document J (England) keeps combustible material, which we read to include multifoil, at least 200 mm from the inside of a flue or 40 mm from the outside of a masonry chimney.[10] See is foil insulation flammable?.