    Short answer

    You check a multifoil installation against the conditions in the product approval for that product. Two of the approvals opened describe multifoil stapled under the rafters, laps taped, counter-battens over it, plasterboard fixed to the battens, and extra insulation as well.[1][2] Once the plasterboard is on, much of this is hidden, and an honest check says so.

    Your next step:Get the foil checked independently

    On this page

    Key facts

    • All three BBA approvals opened require laps of at least 50 mm, taped.[1][2][3]
    • All three BBA approvals opened describe battens over the multifoil, with plasterboard fixed to them.[1][2][3]
    • BBA 18/5575 counts an air gap only where it is at least 13 mm deep in a roof, or 20 mm in a wall.[2]
    • Every worked example in the three BBA approvals opened includes other insulation as well as the multifoil.[1][2][3]
    • Where the underlay has a high vapour resistance, two approvals say the space under it should be ventilated.[1][3]

    What does a correct multifoil installation look like?

    A correct under-rafter installation is a layered build-up, not a sheet of foil on its own.

    What are the ten things the product approvals require?

    The approvals opened set ten conditions, listed here in the order an inspection would check them.

    ConditionWhat to look forWhich approval
    1. PositionStapled tight to the underside of the rafters, from ridge to eaves, typically at 300 mm centres (17/5388) or at no more than 100 mm (18/5575).17/5388, 18/5575[1][2]
    2. LapsOverlapped by at least 50 mm and taped: 75 mm foil tape (17/5388), 100 mm foil tape (18/5575), acrylic tape at least 50 mm wide (06/4379). Tears and cuts taped before boarding.All three BBA[1][2][3]
    3. EavesCut around the rafters and taped to the wall plate (the timber on top of the wall), or the cavity wall insulation (17/5388).17/5388, 18/5575[1][2]
    4. BattensCounter-battens over the multifoil: typically 38 × 47 mm at 600 mm centres (17/5388); no more than 600 mm apart (18/5575); at least 38 × 50 mm, for a 20 mm gap (06/4379). Extra battens around roof windows.All three BBA[1][2][3]
    5. Air gapsAn unventilated cavity on each side of the multifoil. It counts only where it is at least 13 mm deep in a roof, or 20 mm in a wall.18/5575[2]
    6. Above the insulationWhere the underlay has a high vapour resistance, a ventilated space under it, as BS 5250:2011 or the underlay's own approval sets out.17/5388, 06/4379[1][3]
    7. LiningPlasterboard fixed to the battens: to BS EN 520 (17/5388, 18/5575) or 12.5 mm (06/4379).All three BBA[1][2][3]
    8. Extra insulationRequired (17/5388, Kiwa). Every worked example in the three BBA approvals includes other insulation.All four[1][2][3][4]
    9. HeatNo contact with anything hotter than 80 °C.All four[1][2][3][4]
    10. Over-rafter typeFor the breathable type: 25 mm battens parallel to the rafters, 100 mm laps taped, and covered at once.Kiwa BAR-18-045-P-A-UK[4]

    Where an approval is not listed against a row, we did not record that condition from it. That does not mean the product is exempt.

    Checklist

    Multifoil installation and paperwork checklist

    What the product approvals we opened ask for, and the paperwork that shows it was done. Tick what you have or can see. Print or save the list to take to the installer, building control or a surveyor.

    0 of 22 items ticked

    Paperwork

    Based on: LABC (council-hosted) (April 2008) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab); Kiwa (June 2021) (opens in a new tab); LABC (opens in a new tab)

    Checking a product approval

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab); BRE (hosted by CIBSE) (published November 2020) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: Law Society (2024) (opens in a new tab)

    Based on: RICS (March 2023; date from the guide's PDF, the web page shows none) (opens in a new tab)

    What you can see where the foil is on show, or before it is covered

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BRE (hosted by CIBSE) (published November 2020) (opens in a new tab); BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab); HSE as Building Safety Regulator (February 2024, published 28 March 2024) (opens in a new tab)

    Based on: LABC (council-hosted) (April 2008) (opens in a new tab)

    Heat, flues and electrics

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab)

    Based on: BBA (27 January 2017, amended 3 August 2017) (opens in a new tab); BBA (26 September and 9 October 2018) (opens in a new tab); BBA (fourth issue 26 March 2015) (opens in a new tab); MHCLG (2022 amendments) (opens in a new tab)

    Based on: BBA (26 September and 9 October 2018) (opens in a new tab); NICEIC in Professional Electrician (20 May 2021) (opens in a new tab)

    Based on: BBA (26 September and 9 October 2018) (opens in a new tab)

    If something is missing

    • Ask the installer in writing, and keep the reply.
    • LABC's guidance treats a multifoil as acceptable when it is used strictly as its product approval sets out, so a mismatch matters even if the paperwork looks complete.

      Based on: LABC (council-hosted) (April 2008) (opens in a new tab)

    • Behind plasterboard, most of this list can't be seen. An inspection records what can be seen and tested, and says what is hidden.

    Read more:What paperwork you should haveMultifoil product approvalsMultifoil fitted after spray foam removalAfter removal: what good looks like

    Can plasterboard go straight onto multifoil?

    Not in the approvals opened.

    What extra insulation should be there?

    Some: every worked example in the three BBA approvals opened includes other insulation as well as the multifoil.

    What should be above the multifoil?

    Above the multifoil are the rafters with the extra insulation, then the underlay (the felt or membrane under the tiles).

    What can and cannot be checked once the plasterboard is on?

    Once the plasterboard is on, most of the ten conditions are behind it and cannot be confirmed by looking at the finished room.

    Which faults are most common?

    We cannot say which are most common.

    What can an independent inspection add?

    An independent inspection gives you a written record of what can be seen and measured, set against the conditions in the product approval for your product.

    What to do next

    • Find the product name on your paperwork, and the product approval that goes with it.
    • Go through the ten conditions and note which you can see and which you cannot.
    • Ask the installer for the U-value calculation and for what extra insulation was fitted.
    • If something does not match, an independent inspection can record what is there.
    Your next step

    Get the foil checked independently

    A Multifoil / Foil Inspection records what is fitted, how it is fixed and sealed, the air gaps and ventilation that can be seen, and moisture readings at the timbers that can be reached.

    Multifoil / Foil Insulation Inspection£295

    Report within 48–72 hours of inspection. Independent: no installation, no removal, no referral commissions.

    Travel included within about three hours of the North West; a fixed supplement further away, shown with your total before you book.

    It's evidence for your own decisions. It records what can be seen and measured, and says what is hidden.

    Questions first? Call or WhatsApp 07349 718935 WhatsApp (opens in a new tab)

    Not sure yet? See the common problems

    Case files like this

    Anonymised inspections Jan has carried out. Every loft is different.

    See all case files

    Go deeper: the original sources

    4 original documents, each with a note on what it covers.

    Questions people ask

    How far apart should multifoil staples be?

    It depends on the product. BBA 17/5388 gives staples at least 14 mm long, typically at 300 mm centres.[1] BBA 18/5575 gives no more than 100 mm centres and a minimum length of 14 to 40 mm by product.[2] BBA 06/4379 allows double-sided tape, nails or staples and gives no spacing.[3]

    Do multifoil joints have to be taped?

    Yes, in all three BBA approvals opened. Laps must overlap by at least 50 mm and be taped, and tears and cuts must be taped before the plasterboard goes on.[1][2][3] The approvals say each product acts as a vapour control layer, which holds back water vapour, only when its laps and joints are taped.[1][2][3]

    Can multifoil touch downlights, cables or a flue?

    All three BBA approvals opened say multifoil must not touch anything hotter than 80 °C.[1][2][3] BBA 18/5575 says covered cables may need de-rating (a lower permitted load), to as little as half their free-air capacity; downlighters should follow the maker's guidance.[2] Approved Document J (England) keeps combustible material, which we read to include multifoil, at least 200 mm from the inside of a flue or 40 mm from the outside of a masonry chimney.[10] See is foil insulation flammable?.