Yes. Foil insulation needs an air gap: its foil surface adds thermal resistance only when it faces an airspace.[1] The product approvals opened count a roof cavity from 13 mm and a wall cavity from 20 mm; 25 mm is the default in the BR 443 calculation rules.[2][3][4][1] Above 25 mm the resistance stays the same.[1]
On this page
Key facts
- A foil surface adds thermal resistance only when it faces an airspace. Against another surface it adds nothing.[1]
- BR 443 default, unventilated cavity of 25 mm or more, emissivity 0.2: wall 0.44, roof (heat flow up) 0.34, floor (heat flow down) 0.50 m²K/W.[1]
- Above 25 mm the cavity's resistance stays the same. Below 25 mm it falls.[1]
- BR 443 gives a 10 mm wall cavity 0.29 m²K/W and a 5 mm wall cavity 0.17 m²K/W.[1]
- The three BBA approvals opened credit an unventilated roof cavity of at least 13 mm, heat flow up, with 0.45 to 0.47 m²K/W.[2][3][4]
- Two BBA approvals opened credit a wall cavity of at least 20 mm with 0.66 to 0.67 m²K/W.[3][4]
- Where battens squash a multifoil, its thickness there counts as zero unless a robust figure exists (BBA conventions, 15 January 2025).[5]
Does foil insulation need an air gap?
Yes. BR 443, the BRE document that sets the conventions for U-value calculations, says a low-emissivity surface adds thermal resistance only when it faces…
Why does the gap matter?
The gap matters because the cavity beside the foil is given a thermal resistance of its own, and that is lost if the foil touches something.
How big should the gap be: 13, 20 or 25 mm?
It depends on which document applies: the product approvals we opened count a roof cavity from 13 mm and a wall cavity from 20 mm, while 25 mm is the…
Does multifoil still work if the gap is more than 25 mm?
Yes. Under BR 443, an unventilated cavity deeper than 25 mm keeps the same thermal resistance as one of 25 mm.
What happens if the gap is smaller or missing?
A smaller gap gives less resistance, step by step, and with no gap at all the foil face adds nothing.
What happens where battens squash the multifoil?
At each batten the multifoil is squashed thin, and the calculation counts little or nothing for it there.
Does the gap need to be sealed or ventilated?
The gap beside the foil should be unventilated.
How do I know what gap I have?
Once the plasterboard is on you cannot see the gap, so the paperwork and the battens are the evidence.
What to do next
- Find the product name and approval on your paperwork, and read which cavity depth that approval counts.
- Ask the installer which battens were used, and for the U-value calculation if one was done.
- Where the foil is still visible, check for battens over it and tape along every joint.
- If the plasterboard is already on, treat the gap as hidden and unconfirmed, not as missing.
Get the foil checked independently
A Multifoil / Foil Inspection records what is fitted, how it is fixed and sealed, the air gaps and ventilation that can be seen, and moisture readings at the timbers that can be reached.
Report within 48–72 hours of inspection. Independent: no installation, no removal, no referral commissions.
Travel included within about three hours of the North West; a fixed supplement further away, shown with your total before you book.
It's evidence for your own decisions. It records what can be seen and measured, and says what is hidden.
Questions first? Call or WhatsApp 07349 718935 WhatsApp (opens in a new tab)
Go deeper: the original sources
3 original documents, each with a note on what it covers.
Questions people ask
Does multifoil need a 25 mm air gap?
Not according to the product approvals we opened. A common claim is that the BBA requires a 25 mm air gap. The approvals count a roof cavity from 13 mm and a wall cavity from 20 mm.[2][3][4] The 25 mm figure is the default in BR 443, the conventions for U-value calculations, for an unventilated cavity.[1]
Is a 13 mm air gap enough for multifoil?
Can I put plasterboard straight onto multifoil?
Does multifoil need an air gap on both sides?
One approval we opened, BBA 18/5575, requires an unventilated cavity on each side.[3] BR 443 describes a hot-box (laboratory) test of the product with an airspace each side.[1] The BBA's conventions add that if the rafter space is fully filled, the multifoil sits wholly in the plasterboard cavity, so only one airspace counts.[5]
Does the air gap next to foil insulation need ventilating?