Multifoil on its own is not shown to meet the roof U-values in building regulations by any source we opened, as of 10 November 2026. Every worked example in the three BBA approvals opened includes other insulation.[1][2][3] For England, the 2021 edition of Approved Document L gives 0.15 W/m²K for a new or replacement roof element in an existing home.[4]
On this page
Key facts
- Every worked example in the three BBA product approvals opened includes other insulation, as well as the multifoil.[1][2][3]
- England now (2021 edition, in force since 15 June 2022): 0.15 W/m²K for a new or replacement roof element in an existing home.[4]
- England's 2026 edition of Approved Document L takes effect on 24 March 2027. The Welsh 2026 editions take effect on 4 March 2027.[5][6][7]
- A government circular of 18 June 2009 says only hot-box or approved European assessment results carry a statutory presumption.[8]
- The BBA lists as a misconception the idea that an approved product automatically meets Building Regulations (webinar, June 2021).[9]
- We found no mention of multi-foil, and no rule requiring a BBA document, in the parts of England's 2026 edition we read (about two thirds).[5]
Does multifoil meet building regulations on its own?
We found no source showing that it does, as of 10 November 2026.
What U-values apply to a roof?
For England, the 2021 edition, in force since 15 June 2022, gives 0.15 W/m²K for a new or replacement roof element in an existing home, and an improved…
How is a multifoil counted in a U-value calculation?
It is counted from measured product data, plus the air gaps beside it, under published conventions.
What does building control accept as evidence?
The documents we read back a calculated U-value built on product data measured by a recognised test body, and leave other evidence for building control to weigh.
Does a product approval settle it?
No, and the BBA says so itself.
What changes in 2027?
New editions of Approved Document L take effect, on 24 March 2027 in England and on 4 March 2027 in Wales.
When do the rules apply to my job: a new roof, a conversion or a refit?
They apply by type of work, and building control is the body to ask which type your job is.
What to do next
- Ask for the U-value calculation for your roof, and check it names the multifoil, the extra insulation and the air gaps.
- Ask which edition of Approved Document L the job was assessed against, and whether building control was told about the work.
- Compare the product approval with what was fitted.
- If your home is in Wales, ask your building control body which roof figures apply.
Get the foil checked independently
A Multifoil / Foil Inspection records what is fitted, how it is fixed and sealed, the air gaps and ventilation that can be seen, and moisture readings at the timbers that can be reached.
Report within 48–72 hours of inspection. Independent: no installation, no removal, no referral commissions.
Travel included within about three hours of the North West; a fixed supplement further away, shown with your total before you book.
It's evidence for your own decisions. It records what can be seen and measured, and says what is hidden.
Questions first? Call or WhatsApp 07349 718935 WhatsApp (opens in a new tab)
Go deeper: the original sources
3 original documents, each with a note on what it covers.
Questions people ask
What U-value does a loft conversion roof need?
For England, the edition in force since 15 June 2022 gives 0.15 W/m²K for a new or replacement roof element in an existing home, and an improved value of 0.16 for a renovated or retained roof.[4] We do not hold the wording on which applies to a conversion, so ask building control.
Do England's 2027 rules require a BBA document for multifoil?
Not in the parts we read. One insulation manufacturer's page says England's 2026 edition of Approved Document L requires a BBA document or an equivalent. We read about two thirds of that edition and found no such rule, and no mention of multi-foil.[5]
Can the U-value of my roof be measured to prove it?
Not for building regulations, according to BR 443. It says calculated U-values are the route for building regulations, and that measuring one in a finished building is for non-regulatory purposes.[10] An independent inspection records what can be seen and measured, but it does not produce a U-value.
Sources
18 sources, numbered as cited in the text. Tap a footnote number to jump to its source.