Before having multifoil fitted, check where it will go and what its product approval requires. None of the three BBA approvals opened addresses a cold loft or insulation at loft-floor level.[1][2][3] Every worked example in them includes other insulation, and they set out air gaps and taped laps.[1][2][3]
On this page
Key facts
- None of the three BBA approvals opened addresses a cold loft or insulation at loft-floor level.[1][2][3]
- Every worked example in the three BBA approvals opened includes other insulation as well as the multifoil.[1][2][3]
- The approvals' worked examples for an existing roof add 45 mm to 125 mm of rigid board to reach a U-value of 0.18 W/m²K.[1][2][3]
- Where the underlay has a high vapour resistance, two approvals opened say the space under it should be ventilated.[1][3]
- UKAS suspended the BBA on 26 February 2026; as of 10 November 2026 it was still suspended. UKAS says existing approvals remain valid until expiry.[4][5]
Step by step
Cold loft or room in the roof?
Two of the three BBA approvals opened describe roofs where the ceiling follows the pitch and encloses a habitable space.[1][3] None addresses a cold loft or insulation at loft-floor level.[1][2][3] RICS's consumer guide on spray foam (March 2023) says an unused roof void "does not need to be heated", and prefers insulation at ceiling level there.[6] See is foil insulation good for lofts?.
Ask which product and which approval
A product approval is a third-party document on how a product must be fitted. The BBA says a product or use not in its document has not been verified.[7][8] See multifoil product approvals.
Ask for the U-value calculation and the extra insulation
A U-value is a roof's heat-loss figure. Every worked example in the three BBA approvals opened includes other insulation, so ask for a calculation for your roof naming both.[1][2][3] See multifoil or rigid board?.
Ask about battens, air gaps and taped joints
The three BBA approvals opened describe taped laps of at least 50 mm, and battens fixed over the foil.[1][2][3] One asks for an unventilated cavity each side, counted in a roof only where at least 13 mm deep.[2] See how to check an installation.
Ask about the underlay and ventilation
Where the underlay (the felt or membrane under the tiles) has a high vapour resistance, two approvals opened say the space under it should be ventilated.[1][3] The Building Safety Regulator's February 2024 report gives bitumen felt as an example.[9] See does foil insulation cause condensation?.
If building regulations apply, ask who deals with building control
For England, Approved Document L's roof figures for existing homes are 0.15 and 0.16 W/m²K, by type of work, in both the 2021 edition in force and the 2026 edition effective from 24 March 2027 (our comparison).[10][11][12] Ask who will deal with building control, and which figure applies. See multifoil and building regulations.
Get it in writing; know your right to cancel
A November 2025 guide from the Chartered Trading Standards Institute (CTSI) and the Department for Business and Trade, covering doorstep and phone sales, says off-premises contracts carry a 14-day right to cancel.[13] See your rights.
What to do next
- Ask for the product approval and U-value calculation before you sign.
- Get the product, extra insulation and ventilation written into the quote.
- Check any performance claim against what the tests show.
Get the foil checked independently
A Multifoil / Foil Inspection records what is fitted, how it is fixed and sealed, the air gaps and ventilation that can be seen, and moisture readings at the timbers that can be reached.
Report within 48–72 hours of inspection. Independent: no installation, no removal, no referral commissions.
Travel included within about three hours of the North West; a fixed supplement further away, shown with your total before you book.
It's evidence for your own decisions. It records what can be seen and measured, and says what is hidden.
Questions first? Call or WhatsApp 07349 718935 WhatsApp (opens in a new tab)
Go deeper: the original sources
2 original documents, each with a note on what it covers.
Questions people ask
Is foil insulation good for lofts?
Does multifoil meet building regulations on its own?
No source we opened shows that it does, as of 10 November 2026. Every worked example in the three BBA approvals opened includes other insulation.[1][2][3] One says additional insulation "will be required" to meet national thermal requirements.[1] The BBA lists as a misconception the idea that an approved product automatically meets Building Regulations (June 2021).[7]
Can plasterboard go straight onto multifoil?
Sources
15 sources, numbered as cited in the text. Tap a footnote number to jump to its source.